Venue modelling
· 6 min read
Movable walls, derived spaces: why capacity should never be typed by hand
When a hall can become three rooms, capacity, egress, rigging and pricing all change. Those numbers belong to the geometry, not to a spreadsheet.
Insights
Practical thinking from building a multi-operator venue platform, modelling decisions, twin architecture and what actually survives show day.
Every note here is drawn from decisions inside the platform. Book a walkthrough and see them in context.